14

Maintenance

14.1

Preventive maintenance

14.1.1 Performed by the customer
14.1.2 Performed by the maintenance technician
Building Technologies
Fire Safety
Once a week
Check that all leds and buzzer are activated with the "Led test"
The maintenance operation of an extinguishing installation must be performed by
a qualified and trained technician who is familiar with XC10 control panel and
knows all the risks relating to extinguishing.
Every year
1 - Visual inspection of documents
Ask the customer to provide the XC10 operating manual and ensure that he
knows how to operate the panel.
Check all events occurred on the installation since the last maintenance visit.
Theses events must be recorded by the customer on a maintenance diary.
Check the accuracy of all installation documents like electrical and mechanical
drawings, components location drawings.
2 - Visual inspection of the installation
Check the conformity of the extinguishing installation, especially the adequation
between the type of extinguishing agent and the risk to protect. Check any
changes inside the protected room, performed by the customer.
Check that the electrical installation is not damaged and is in a good condition.
Check the structure and the air-tightness of the protected room, including false
floors and false ceilings.
Ensure that the volume of the protected room was not changed and the
extinguishing agent concentration calculated during commissioning is still valid.
Before starting any operation, assess the installation status with the customer
who is in charge of the building security. Notice any Fault or Disablement
condition.
Before starting the maintenance operation, the transmission of the
extinguishing signal to the gaz cylinders must be disabled. This
disabling shall be carried out with the presence of the custumer who is
in charge of the building security and who will have to ensure of the re-
enabling at the end of the maintenance operation.
Check with the customer if there are any local instructions. Ensure that
you are allowed to use your material without restriction (i.e; ATEX,
chemical or nuclear zones). For example, in ATEX zones, detector
exchanger and tester is usually not allowed.
3 - Maintenance operation
3.1 - Preparation
Maintenance
79
A6V10257473_e_en_--
2015-03-04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xc1005-aXc1003-a

Table of Contents