Installation
6
Installation
6.1
XC1001-A / XC1005-A
22
Building Technologies
Fire Safety
Generally, the XC10 must be easily accessible and installed:
-
outside the protected area
-
protected from mechanical shocks and bad weather
The XC10 must be installed on a fixed and stable support, with a height ranging
between 1.60 m and 1.70 m (eliminate the irregularities from the mounting surface
≥ 5 mm).
1. Remove the front cover
2. Mark and drill the mounting holes using the drilling template provided (start with
the hole for the top central screw)
3. Fix the chassis using 3 screws Ø 4 x 50 mm (not provided)
4. Cut out the cable entries
5. Cut out the plastic housing according to the cable inputs (XC1001-A)
6. Mount the cable glands if necessary (required for protection rating IP30)
7. Install the batteries and fix the battery holders
1
12 V – 4.5 Ah batteries
Fig. 7
XC1001-A, battery installation
A6V10257473_e_en_--
2015-03-04