Procedure
1. Screw the mounting screws directly into the wall or ceiling, or using the wall anchors
2. Plug the Ethernet cable into the slot on the back of the base station until you hear
3. Ensure that the cable is securely attached and not disrupted, then mount the base
Next steps
After installing and connecting the base station to IP Office, register the handsets and install
the appropriate repeaters for that base station.
Powering the base station
The base station receives power through the Ethernet cable using Power over Ethernet (PoE).
Ensure that you plug the provided cable into a PoE-enabled switch that connects to the network
D100 SIP Wireless Terminal Installation and Administration Guide
provided. Install the screws 8.3 cm apart vertically, in a space that has 4.5 cm
clearance above the top screw, 6 cm clearance to either side, and 7.5 cm clearance
below the bottom screw.
Leave the screw heads about 2 mm out from the mounting surface.
it click.
station on the screws installed in step 1.
Overview
December 2012
41