GE C70 Instruction Manual page 469

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CHAPTER 9: THEORY OF OPERATION
Differentiating this gives:
dV
-------- - 1
dC
Substituting for V
from equation 9.34 gives:
X
This can be substituted into equation 9.33 to obtain:
For our purposes,
C
C
C
A
B
Under normal system conditions (non-fault), V
V
, which by convention is on the bus voltage base, converted to the base of nominal value of the neutral-point VT used
Spg
in these equations, is:
This gives:
This can be written as:
In these equations, ΔC(pu) is the capacitance change as a per-unit of the leg capacitance, and V
signal resulting from the failure in per-unit of the nominal value of the neutral-point VT. V
voltage in per-unit of the nominal system phase-to-ground voltage, so can be taken as 1 when the system is normal (not
faulted). Note however that under external fault conditions sensitivity can be much different from the non-fault sensitivity.
n
and n
are the VT ratios of the phase VT bank of the bus source and of the auxiliary VT channel of the neutral
bus_phs
ntrl_aux
source, respectively.
Note that under external fault conditions sensitivity can be much different form the non-fault sensitivity. To prevent mis-
operation, use a restraint and/or coordinating time delay.
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
C
+
C
1
 V
X
B
C
---- -
+
---------------- -
+
V
X
C
C
C
C
A
A
-------- - V
dC
-------- - V
dC
(
3V
V
1 k
d
0
B
-------- - V
=
------------------------------------------------------------------------ -
X
dC
C
(
1 k
+
C
A
d
1
-------- - V
=
-- 1 k
(
+
+
k
OP
AB
dC
3
C
3V
V
(
1 k
1
0
B
=
------------------------------------------------------------------------ -
--
(
C
1 k
3
A
, so
and
. This results in:
k
1
k
1
C
AB
AC
V
d
1
C
-------- - V
--
--------------- -
OP
dC
3
C
C
1
1
--
×
---- -
=
3
C
>> V
, and V
C
0
n
bus_phs
----------------- -
×
n
ntrl_aux
1
1
d
--
---- -
-------- - V
×
×
OP
3
C
dC
C
C
n
1
bus_phs
dV
--
×
----------------- -
OP
3
n
ntrl_aux
n
1
bus_phs
--
----------------- -
V
(
pu
)
×
OP
3
n
ntrl_aux
1
---- -
=
0
C
A
V
V
d
X
C
------------------------------------ -
=
X
C
+
C
B
C
C
C
1
+
---------------- -
A
C
A
V
V
d
X
C
=
--------------------------------------- -
X
(
)
C
1 k
+
+
k
A
AB
AC
C
)
(
)
V
2 k
+
AB
C
AB
2
+
k
)
AB
AC
dV
X
)
-------- -
AC
dC
C
)
V
(
2 k
+
)
AB
C
AB
)
+
+
k
AB
AC
V
0
C
×
V
V
C
0
C
is the system phase-to-ground voltage. The system voltage
C
V
Spg
n
bus_phs
----------------- -
×
V
Spg
n
ntrl_aux
dC
C
×
V
×
-------- -
Spg
C
C
×
V
×
Δ
C pu
(
)
Spg
Spg
OVERVIEW
Eq. 9-35
Eq. 9-36
Eq. 9-37
Eq. 9-38
Eq. 9-39
Eq. 9-40
Eq. 9-41
(pu) is the operating
OP
is the system phase-to-ground
9-9
9

Advertisement

Table of Contents
loading

Table of Contents