GE C70 Instruction Manual page 413

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CHAPTER 6: ACTUAL VALUES
The metered phase voltage values are displayed in this menu. The "SRC 1" text is replaced by the name programmed by
the user for the associated source (see
6.3.2.5 Auxiliary voltage metering
ACTUAL VALUES  METERING  SOURCE SRC 1  AUXILIARY VOLTAGE
 AUXILIARY VOLTAGE
 SRC 1
The metered auxiliary voltage values are displayed in this menu. The "SRC 1" text is replaced by the name programmed by
the user for the associated source (see
6.3.2.6 Power metering
ACTUAL VALUES  METERING  SOURCE SRC 1  POWER
 POWER
 SRC 1
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
SRC 1 POS SEQ V1:
0.000 V
0.0°
SRC 1 NEG SEQ V2:
0.000 V
0.0°
SETTINGS  SYSTEM SETUP  SIGNAL SOURCES
SRC 1 RMS Vx:
0.00 V
SRC 1 PHASOR Vx:
0.000 V
0.0°
SETTINGS  SYSTEM SETUP  SIGNAL SOURCES
SRC 1 REAL POWER
3φ: 0.000 W
SRC 1 REAL POWER
φa: 0.000 W
SRC 1 REAL POWER
φb: 0.000 W
SRC 1 REAL POWER
φc: 0.000 W
SRC 1 REACTIVE PWR
3φ: 0.000 var
SRC 1 REACTIVE PWR
φa: 0.000 var
SRC 1 REACTIVE PWR
φb: 0.000 var
SRC 1 REACTIVE PWR
φc: 0.000 var
SRC 1 APPARENT PWR
3φ: 0.000 VA
SRC 1 APPARENT PWR
φa: 0.000 VA
SRC 1 APPARENT PWR
φb: 0.000 VA
SRC 1 APPARENT PWR
φc: 0.000 VA
SRC 1 POWER FACTOR
3φ:
1.000
SRC 1 POWER FACTOR
φa:
1.000
METERING
).
).
6
6-15