Promise Technology VSky A1100 Product Manual page 14

Table of Contents

Advertisement

Hardware Setup
Follow these steps to install the mounting rails in an equipment rack.
1. On the right and left sides of the server, secure the Rail Latches to the server housing using the latch
screws, two screws for each latch.
2. Determine what height to place the server in the rack, then place the right
and left rack rails at the same height on in the right and left rack position.
This is a 1U server, so choose the mounting holes accordingly for your
rack system. Consult the documentation for your rack if you are unsure
which holes to use.
3. Secure the rails to the rack posts. Make sure the rack rails are properly
oriented in the rack.
To set the rails into the rack posts and secure the rails, follow these steps:
a.
Press the spring lock then insert the studs into the
selected square holes on the rack post.
b.
Press the spring lock on the other end of the rail and
insert the studs into the selected mounting hole on
the rack post. If necessary, extend the rail to reach
the post.
c.
Use the rail screws and washers to anchor the rack
rail to the post.
d.
Make sure the rack rail is aligned, secure, stable and
in the correct place.
e.
Perform steps a through c above for the other rail.
f.
Make sure the rack rails are aligned, secure, stable
and in place.
9
Promise Technology, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsky a1970

Table of Contents