Daily Walk-Around Inspection - Sheet 4 Of 4 - JLG E600 Operation And Safety Manual

Table of Contents

Advertisement

20. Oscillating Axle and Lockout Valve (If Equipped) - Check
the lockout valve plunger in the depressed position.
Swing the turntable until the axle lockout bracket passes
the plunger and make sure the plunger is fully extended
as shown below
3121217
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
Figure 2-7. Daily Walk-Around Inspection - Sheet 4 of 4
– JLG Lift –
21. Battery Compartment - See Note
22. Fuel Supply - Fuel filler cap secure; Tank - Decals secure
and legible.
23. Hydraulic Oil Filter Housing - See Note
24. Battery Charger - See Note
25. Turntable Bearing - Evidence of proper lubrication. No
loose bolts or looseness between bearing and structure.
26. Swing Motor - Evidence of proper lubrication.
27. Platform Pivot Pins - See Note
28. Platform Gate - Latch and Hinges in working condition.
29. SkyGuard (If Equipped) - See Inspection Note.
2-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M600jM600jpE600jE600jpM600

Table of Contents