Daily Walk-Around Inspection - JLG 330CRT Operation & Safety Manual

Hide thumbs Also See for 330CRT:
Table of Contents

Advertisement

SECTION 2 - PREPARATION AND INSPECTION
Steer Cylinder
No rust, nicks, scratches or foreign material on piston rod;
no leakage.
Steer Linkage
No loose or missing parts; no visible damage.
Front Spindle Assemblies
No excessive wear; no damage; evidence of proper lubri-
cation.
Control Boxes (Console and Ground)
Switches operable; no visible damage; placards secure
and legible; controller operable; no visible damage.
Battery
Proper electrolyte level; cable connections tight; no visible
damage; no corrosion at battery cable connections.
Engine
Engine oil level - full mark on dipstick; filler cap secure; air
filter secure.
Hydraulic Pump and Valves
No visible damage; no leakage; units secure.
Platform Placards
No visible damage; placards secure and legible.

2.4 DAILY WALK-AROUND INSPECTION

It is the user's responsibility to inspect the machine before
the start of each workday. It is recommended that each
user inspect the machine before operation, even if the
machine has already been put into service under another
user. This Daily Walk-Around Inspection is the preferred
method of inspection.
In addition to the Daily Walk-Around Inspection, be sure to
include the following as part of the daily inspection:
Overall Cleanliness
Check all standing surfaces for oil, fuel and hydraulic oil
spillage and foreign objects. Ensure overall cleanliness.
Placards
Keep all information and operating placards clean and
unobstructed. Cover when spray painting or shot blasting
to protect legibility.
2-2
Operators Manual
Ensure a copy of this manual is enclosed in the manual
storage box.
Machine Log
Ensure a machine operating record or log is kept. Check
to see that it is current and that no entries have been left
uncleared, leaving machine in an unsafe condition for
operation.
Daily Lubrication
For those items pointed out in the Daily Walk-Around
Inspection requiring daily lubrication, refer to the Lubrica-
tion Chart in this manual for specific requirements.
Perform the following checks and services before attempt-
ing to operate the machine.
TO AVOID INJURY DO NOT OPERATE A MACHINE UNTIL ALL
MALFUNCTIONS HAVE BEEN CORRECTED. USE OF A MALFUNC-
TIONING MACHINE IS A SAFETY VIOLATION.
1. Start each day with a full fuel tank.
2. Ensure that all items requiring lubrication are ser-
viced in accordance with the Lubrication Chart in
this section.
3. Perform functional checks in accordance with para-
graph 2-5, Daily Functional Check.
– JLG Lift –
3121803

Advertisement

Table of Contents
loading

This manual is also suitable for:

400crt

Table of Contents