JLG E600 Operation And Safety Manual page 37

Table of Contents

Advertisement

GENERAL
Begin your Walk-Around Inspection at item 1, as noted on the
diagram. Continue to your right (counterclockwise viewed from
the top) checking each item in sequence for the conditions
listed in the following checklist.
TO AVOID POSSIBLE INJURY BE SURE MACHINE POWER IS OFF DURING "WALK-
AROUND INSPECTION".
DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDERSIDE. CHECKING THIS
AREA MAY RESULT IN DISCOVERY OF CONDITIONS WHICH COULD CAUSE EXTENSIVE
MACHINE DAMAGE.
NOTE:
On each item, make sure there are no loose or missing parts,
that they are securely fastened and that no visible damage
exists in addition to any other criteria mentioned.
1. Platform Assembly - Platform mounting pins secure. Foot-
switch in good working order; not modified, disabled or
blocked.
3121217
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
Figure 2-5. Daily Walk-Around Inspection - Sheet 2 of 4
– JLG Lift –
2. Platform & Ground Control Console - Switches and control
levers; placards secure and legible; control lever and
switches return to neutral; control lever lock functions
properly; emergency stop switch functions properly; con-
trol markings legible.
3. Rotator - See Note.
4. All Hydraulic Cylinders - No visible damage; Pivot pins and
hydraulic hoses undamaged, not leaking.
5. Boom - Pivot pins secure; Upright in vertical position. See
Note.
6. Drive Axle and Motor - See Note
7. Wheel/Tire Assembly - No loose or missing lug nuts,
proper inflation (pneumatic). Inspect for worn tread, cuts,
tears, or other discrepancies. Inspect wheels for damage
and corrosion
8. Frame (top and underside) - See Note.
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M600jM600jpE600jE600jpM600

Table of Contents