JUKI IT-100 Instruction Manual page 17

Table of Contents

Advertisement

No.
Item to be set
Target pitch time setting
switch
Daily target production
volume setting switch
Current target production
volume correction switch
(4)-2 In the case of calculating the target production volume according to the specified starting/fin-
ishing times of day of work and total production volume
The target production volume as of the current time of day is calculated and displayed on the production man-
agement screen under the sewing mode by setting data on the time period during which sewing work is carried
out such as the starting/finishing/resting times of day and a daily target production volume.
*
Three different working conditions
ing machine, the machine should be used after the entry of working hours on an operator-by-operator
basis.
<Production management function setting screen (in the case of calculating the target production
volume by setting the starting/finishing times of day and the total production volume)>
Input data on items ❼ to ❾ referring to the table given in the next item.
Screen closing switch  is pressed, the screen is closed and restored to the previous screen.
When
Clear switch  is pressed, the operating time and rest time and the daily target production volume of
When
the selected working conditions
The target pitch time for sewing work is set. Every time the length of time corre-
sponding to the target pitch time is elapsed, the current target production volume
is counted up.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a set value in the popup screen.
* When the target pitch time is changed, the current target production volume ❹
is automatically cleared.
The target production volume to be produced from the starting to the end of
working hours in a day is set.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a set value in the popup screen.
The current target production volume that is counted up every time the length of
time corresponding to the target pitch time is elapsed can be corrected.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a corrected value in the popup screen.
to
can be entered. When two or more operators use one sew-
to
can be totally cleared.
– 14 –
Description



Advertisement

Table of Contents
loading

Table of Contents