Omega Engineering OMB-CHARTSCAN 1400 User Manual page 122

Portable data recorder
Table of Contents

Advertisement

1.
With power "OFF" to the main unit, complete the system setup as indicated by the previous figure and
table.
2.
Turn power "ON" to the main unit, Cold Cell, calibrator, and digital multimeter. Allow at least one
hour warm up time before proceeding. Allow at least 2 hours warm-up for the Cold Cell.
3.
If the calibration password has not been changed, enter
enter the K command and current password. This enables the calibration mode.
6-18 Calibration
The main unit (chassis) and T/C cards must be calibrated for offset and gain prior
to calibrating the T/C cards for cold junction.
Do not install or remove any cards from the main unit, or from its expansion
chassis unless the unit is powered "OFF" and has no power sources connected to
it.
Do not perform calibration until after the main unit has been powered on for at
least one hour, and the Cold Cell powered on for at least 2 hours. The cards to be
calibrated, including those in an expansion chassis (if used), should be installed
prior to the 1 hour chassis warm-up, and should be in the slots in which they will
be used during data acquisition.
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
. If the password has been changed,
K12345
ChartScan User's Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omb-chartscan-1400

Table of Contents