4.5.6 Through an Existing Masonry Chimney

1. Position
stove
shown
in
Section
Clearances
to
following
vent
instructions.
2. Mark the center of the hole where the
vent pipe will go through the masonry
chimney.
3. It is necessary to make a hole in the
masonry with a one-inch diameter
greater than the diameter of the vent
pipe used.
4. Install a vented flashing at the top of the
masonry chimney. Stainless steel plate
and screws are recommended. Cut a
hole for the vent pipe. If needed, cut a
second hole for the air intake pipe. Seal
all
joints
with
waterproof silicone sealant to prevent
water leakage.
5. Install the cleanout tee at the bottom of the vertical vent system and lower it down the
chimney until the center branch of the tee is aligned with the hole in the masonry.
6. Install and seal flashing with high temperature waterproof silicone sealant.
7. Seal and install vertical roof vent. If required, seal and install a storm collar.
8. Connect the horizontal vent pipe to the cleanout tee by pushing it through the hole in the
masonry.
9. If desired, once the horizontal pipe is in place, the space between the pipe and masonry
may be filled with high-temperature grout.
If desired, install a trim collar and use an additional horizontal vent pipe length, if required, to
connect the stove to the chimney.
Euromax Pellet Stove Installation and Operation Manual
following
clearances
3.2
Minimum
Combustibles
and
manufacturer's
high
temperature
12"-18"
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents