Through A Factory Built Chimney - Enerzone Euromax EP00070 Installation And Operation Manual

Table of Contents

Advertisement

4.5.4 Through a Factory Built Chimney

To make an installation through a factory
built chimney, run a 4" stainless steel liner
inside the factory built chimney.
1. Position
stove
given
in
Section
Clearances
to
following
vent
instructions.
2. Install a cleanout tee to the stove flue
outlet. If necessary, use a horizontal
additional length between the flue outlet
and the tee. If you wish to center the
vertical part of the vent with the stove, a
45° elbow and a tee can be used to
route the pipe from the flue outlet
towards the back center of the stove.
3. Connect the pellet vent to the stainless
steel
liner
according
manufacturer's instructions.
4. Seal and install vertical roof vent. If
required, seal and install a storm collar.
WARNING: IN THE U.S., THE USE OF A STAINLESS STEEL LINER IS MANDATORY. IN
CANADA, IT IS NOT MANDATORY BUT IS STRONGLY RECOMMENDED.
NOTE: VENTING DIRECTLY IN AN OVERSIZED CHIMNEY AND OMITTING THE USE OF
A STAINLESS STEEL LINER CAN AFFECT CHIMNEY DRAFT AND DECREASE STOVE
PERFORMANCES.
Euromax Pellet Stove Installation and Operation Manual
following
clearances
3.2
Minimum
Combustibles
and
manufacturer's
to
the
vent
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents