SDMO RENTAL POWER R550C2 User And Maintenance Manual page 47

Generating sets
Table of Contents

Advertisement

AUTOMATIC STOP
IN PROGRESS
G 9
LOAD SUPPRESSION
24/08/2005
AUTOMATIC STOP
IN PROGRESS
G 10
COOLING
24/08/2005
COUPLING
IN PROGRESS
G-10/1
24/08/2005
POWER TRANSFER
Grid
G-10/2
24/08/2005
POWER TRANSFER
Grid
G-10/3
24/08/2005
1min30
13:12
1min30
13:14
13:14
Generating set
13:16
Generating set
13:16
45/298
Operation mode - operation in AUTO mode
Power supply device opens (motorised circuit
breaker or changeover switch controlled by the
TELYS)
Countdown of the Mains Return delay OR Test on
load delay
Date and time (depending on settings)
Operation mode - operation in AUTO mode
Genset cooling in progress
Countdown of the Engine Stop delay (cooling) OR
Gradual Stop delay (Water temperature) OR
Overload Gradual Stop delay OR No Load Test
delay
Date and time (depending on settings)
Operation mode - operation in AUTO mode
Synchronisation of the genset with the grid or
another genset
Date and time (depending on settings)
Operation mode - operation in AUTO mode
Transfer of power from the generating set to the grid
Date and time (depending on settings)
Operation mode - operation in AUTO mode
Transfer of power from the grid to the generating set
Date and time (depending on settings)