Removal Of Pcb - Daikin CTXU25G2V1B Service Manual

Inverter multi system with humidifying
Hide thumbs Also See for CTXU25G2V1B:
Table of Contents

Advertisement

Indoor Unit
1.6

Removal of PCB

Procedure
Step
1. Removing the shield plate
1
The figure shows the
appearance of the
electrical box.
2
Open the shield plate
(at the top).
Unfasten the hook at
3
the back of the shield
plate.
4
Lift up the shield plate
to unfasten the hooks
(lower) and remove it.
197
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Signal receiver PCB
Hook
Preparation
Remove the electrical box
according to the "Removal
of Electrical Box".
INTELLIGENT EYE
PCB
(R8083)
Hook
(R8085)
Shield plate
Hook (back)
Hook (lower)
(R10619)
SiBE12-908
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ctxu35g2v1b2mxu40gv1bCtxu42g2v1b2mxu50gv1bCtxu50g2v1b

Table of Contents