Workflow - Fujitsu PRIMERGY RX600 S4 User Manual

Hide thumbs Also See for PRIMERGY RX600 S4:
Table of Contents

Advertisement

1.5 Workflow

To start the server operation, perform the following procedures.
Installing the server
Refer to "Safety Precautions" and "Start Guide" to install the server on a suitable location.
Preparing the server
- Install internal options
- Set configurations of hardware
Refer to "2.1 Preparation on the Server", "Chapter 6 Installing Internal Options" and
"Chapter 7 Configuring Hardware and Utilities".
Selecting a installation method and observing precautions on installation
Refer to "2.2 Selecting an Installation Method" to decide what installation method to use.
Prior to OS installation, observe precautions with referring to "2.3 Precautions on Installation".
OS installation
Refer to "Chapter 3 OS Installation" to perform OS installation.
Installing internal options
Refer to "Chapter 6 Installing Internal Options" to install the internal options.
Operations before running the server
Before operating the server, refer to "Chapter 4 Operations after OS Installation".
High reliability tools installation
For ServerView, the settings is required prior to the server operation.
For details on each high reliability tool, refer to "Chapter 5 High Reliability Tools".
PRIMERGY RX600 S4 User's Guide
Start operations
41

Advertisement

Table of Contents
loading

Table of Contents