Kubota WSM B2050 Workshop Manual page 387

Table of Contents

Advertisement

B2050, B2350, B2650, B3150, WSM
Front Loader Valve Assembly
1. Remove the brake rod (1).
2. Disconnect the 3-point hitch delivery pipe 1 (2), 3-point hitch
delivery pipe 2 (4) and return hose (6).
3. Remove the loader valve assembly (3).
4. Remove the cable stay (5) with cables.
(When reassembling)
• Do not damage the O-rings of front loader valve pipes and
delivery pipes.
• Apply liquid gasket (Three Bond 1206D or equivalent) to joint
face of the rear axle case and differential gear case after
eliminating the water and oil.
Front loader valve pipe joint
bolt
3-point hitch delivery pipe 1
joint bolt
Tightening torque
3-point hitch delivery pipe 2
joint bolt (Front loader
valve side)
3-point hitch delivery pipe 2
joint bolt (Hydraulic cylinder
case side)
(1) Brake Rod
(2) 3-Point Hitch Delivery Pipe 1
(3) Loader Valve Assembly
8-S20
HYDRAULIC SYSTEM
48 to 70 N·m
4.9 to 7.1 kgf·m
36 to 51 lbf·ft
48 to 70 N·m
4.9 to 7.1 kgf·m
36 to 51 lbf·ft
48 to 70 N·m
4.9 to 7.1 kgf·m
36 to 51 lbf·ft
50 to 60 N·m
5.1 to 6.1 kgf·m
37 to 44 lbf·ft
(4) 3-Point Hitch Delivery Pipe 2
(5) Cable Stay
(6) Return Hose
9Y1210982HYS0028US0
KiSC issued 03, 2014 A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wsm b2350Wsm b2650Wsm b3150

Table of Contents