Toshiba e-STUDIO 200L Service Manual page 281

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO 200L:
Table of Contents

Advertisement

Note:
When installing the developer unit upper
cover, make sure that the side seal comes
between the developer unit upper cover and
rubber seal on the cover.
(3)
Remove the developer material from rear
side.
Note:
When removing the developer material, be
careful not to drop the developer material on
the gears of the developer unit.
[D] Filling developer unit with developer material
(1)
Install the developer nozzle jig on the devel-
oper bottle.
(2)
Rotate the gear on the rear side of the devel-
oper unit to the direction of the arrow while
filling the developer unit with the developer
material. Spread out the developer material
over the developer sleeve.
June 2004 © TOSHIBA TEC
Rubber seal
Developer unit
upper cover
Fig.12-11
Fig.12-12
Lid
Fig.12-13
e-STUDIO200L/202L/230/232/280/282 DEVELOPMENT SYSTEM
12 - 11
Side seal
12

Advertisement

Table of Contents
loading

Table of Contents