5. Assemble the reverse shaft assembly and input shaft
assembly
if
previously
illustrations).
disassembled
(see
9924096 - 2013 RANGER RZR XP 900 / RZR XP 4 900 Service Manual
© Copyright 2012 Polaris Sales Inc.
6. Install the idler gear shaft assembly (A) and gear
cluster assembly (B) into the transmission housing, all
at the same time.
A
B
7. Install the rear output shaft assembly (C). Rotate
output shaft assembly to align slots with engagement
dog. Ensure bearing is fully seated upon assembly.
8. Assemble shift shaft rail if previously disassembled.