Polaris xp 2013 eps Service Manual page 295

Table of Contents

Advertisement

CAUTION
New bolts have a pre-applied locking agent
which is destroyed upon removal. Always use
new brake caliper mounting bolts
upon assembly.
7. Install the steering tie rod end onto the front bearing
carrier.
NOTE: Refer to the photos below to ensure proper
placement of the tie rod end.
42.5 ft-lbs
58 (Nm)
8. Torque the tie rod end fastener to specification and
install a new cotter pin.
Tie Rod End Fastener:
42.5 ft-lbs (58 Nm)
Tie Rod End
= T
9924096 - 2013 RANGER RZR XP 900 / RZR XP 4 900 Service Manual
© Copyright 2012 Polaris Sales Inc.
9. Torque wheel hub nut to specification and install a
new cotter pin. Tighten nut slightly if necessary to
align cotter pin holes. Bend both ends of cotter pin
around end of spindle in different directions.
80 ft-lbs
(108 Nm)
Wheel Hub Castle Nut:
80 ft-lbs (108 Nm)
10. Install wheel and (4) wheel nuts. Torque wheel nuts
to specification.
Wheel Nuts:
30 ft-lbs (41 Nm) + 90° (1/4 turn)
11. Rotate wheel and check for smooth operation.
FINAL DRIVE
NEW Cotter Pin
= T
= T
7.5
7

Advertisement

Table of Contents
loading

Table of Contents