CPI MOTOR
GTR180
XII.WHEEL & BRAKE SYSTEM
Install the fork spring into the fork tube.
1. Install the fork spring into the fork tube.
Be care for fork spring rebound.
2. Install the cap bolt
3. To bring pressure to bear on cap bolt for 5 to 7kg.
4. Install the clip into the fork tube on the cap bolt.
NOTE
Hold the fork tube in a vice.
Tighten the fork bolt.
TORQUE:
4.0~5.0 Kg-m
《12 -25 》