Log Installation - kozy heat 55801 Duluth Installation & Operating Manual

Free-standing direct vent fireplace
Table of Contents

Advertisement

LOG INSTALLATION.

This 6 pc. log set includes:
BASE LOGS & EMBERS INSTALLATION:
Set the DU, OB2, and OB3 logs into position
#
on the millivolt board as shown in Figures
13A & 13B.
NOTE: The front of the 'DU' log should be
#
against the back side of the burner tube.
Pull the OB2 and OB3 logs forward as close
#
to the burner as possible.
# Place a row of klinkers in front of the burner
tube. (See Figure 13C.)
# Place rock wool embers as desired onto the
base logs & burner to enhance flame &
glowing effect (See Figure 13B.)
CAUTION: DO NOT COVER THE BURNER PORT
HOLES IN FRONT OF THE PILOT. BLOCKING
THESE PORTHOLES MAY RESULT IN DELAYED
IGNITION OF THE BURNER.
Note: You will not use all the embers included
in the packet at this time.
future use.
TOP LOGS
:
Position the (2) OB5 logs and 'C' log onto
#
the base logs as shown in Figure 13C.
NOTE: The OB5 logs should be positioned
#
with the 'burnt' area on the inside as shown
in Figure 13C
.
NOTE: During the initial burn period, the logs and refractory will discolor. This is normal and part of the curing
process. Once the curing process is complete, (approximately 2-4 hrs.) the true color will return.
DO NOT BURN THIS FIREPLACE WITHOUT THE GLASS ENCLOSURE IN PLACE.
(1) 'DU' log
(2) 'OB5' log
(1) Embers Packet
Save for
INITIAL BURN PERIOD
**MAKE SURE THE HOMEOWNER IS AWARE OF THIS**
(1) 'OB2' log
(1) 'C' log
OB2
OB5
`````````
Page 15
(1) 'OB3' log
(1) Klinkers Packet
DU
Figure 13A
OB3
Figure 13B
OB5
C
Klinkers
Figure 13C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents