Daily Preliminary Operations - Sanremo OPERA The Revolution Instruction Booklet

Table of Contents

Advertisement

Available languages

Available languages

CAP. 5
5.7 - DAILY PRELIMINARY OPERA-
TIONS
5.7.a - Starting the machine (Fig. 9-9a)
Check that the water supply tap upstream of the
machine is open.
Check that the thermal breaker upstream of the
machine is set to "ON".
Press switch (1), which will turn on; water in the
boiler will be automatically heated, as well as the
cup heating plate.
• Place the filter holders in the relevant units.
Wait for the water temperature to reach the set
value shown on the top part "A" of display (2) on
the dispensing unit.
Wait for the steam temperature "B" shown on dis-
play (3) to reach the set value "123°C ÷ 124°C".
Wait for the water temperature "C" shown on display
(3-4) to reach the set value "85°C".
Fig. 9A
B
MAX
124
°F
°C
MIN
02-2014
Operation of the machine
A
3
7 / 22
Fig. 9
A
1
085
4
2
OPERA
2 Units
B
124
MAX
°F
°C
085
°F
MIN
C
3
2
EN
3 Units
C

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents