CAP. 5
5.7 - DAILY PRELIMINARY OPERA-
TIONS
5.7.a - Starting the machine (Fig. 9-9a)
•
Check that the water supply tap upstream of the
machine is open.
•
Check that the thermal breaker upstream of the
machine is set to "ON".
•
Press switch (1), which will turn on; water in the
boiler will be automatically heated, as well as the
cup heating plate.
• Place the filter holders in the relevant units.
•
Wait for the water temperature to reach the set
value shown on the top part "A" of display (2) on
the dispensing unit.
•
Wait for the steam temperature "B" shown on dis-
play (3) to reach the set value "123°C ÷ 124°C".
•
Wait for the water temperature "C" shown on display
(3-4) to reach the set value "85°C".
Fig. 9A
B
MAX
124
°F
°C
MIN
02-2014
Operation of the machine
A
3
7 / 22
Fig. 9
A
1
085
4
2
OPERA
2 Units
B
124
MAX
°F
°C
085
°F
MIN
C
3
2
EN
3 Units
C