2.4.c - Storage

The crate containing the machine must be stored covered from the weather and no
other crate, box or other material must be placed on top of it.

2.5 - CHECK UPON RECEIPT

When the shipment is received, check that the package is in good conditions and not visibly damaged.
If all is ok, remove the package as described in point 2.6 (unless different instructions have been provided by
the manufacturer).
Check that the package contains the instructions manual and all components listed in the bill of transport.
If damage or faults are found:
a- Immediately inform the carrier and your agent, both by phone and in writing with notice of receipt;
b- Inform the manufacturer.
2.6 - UNPACKING (Fig. 2)
In order to prevent risks of contamination,
we recommend unpacking the equipment
only when it is time to install it.
To remove the machine from the package, proceed
EN
as follows:
Remove the upper cover (1).
Remove the side walls (2).
Remove the internal protection inserts (3).
Check that all is in good conditions.
Remove the plastic bag (4).
Pull out accessories, instruction manuals, etc.
Check that the shipment is compliant.
The packaging elements (plastic bags,
carton, nails, etc.) MUST not be left within
reach of children, since they are potential
hazard sources; therefore they must be
collected and sent to the proper recycling
centres.
Any communication relating to any damage
or fault or non-conformity must be timely
and must be sent within 8 days from receipt
of the machine. Otherwise the goods are
deemed to have been accepted.
Technical Data - Transportation - Unpacking
-----------------------------------------------------------------------------
IMPORTANT
HAZARD
IMPORTANT
IMPORTANT
Fig. 2
3
4 / 6
CAP. 2
1
2
4
3
02-2014

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents