Volvo Penta D65A MS Workshop Manual page 166

Table of Contents

Advertisement

Group 23 Fuel System
166
Plus d'informations sur : www.dbmoteurs.fr
7. Remove the plunger spring retaining jig and the
rack setting jig. Make sure the control rack slides
and strokes smoothly.
IMPORTANT! Move the rack after installing each
plunger assembly to make sure it moves
smoothly (sliding resistance: 4.9 N (0.5 kgf) [
1.10 lbf] or less). At the same time, check to
make sure the total rack stroke is 36 mm [ 1.42
in.].
Control rack sliding resistance
1. After the pump assembly is completed, attach a
spring balancer to the control rack and make sure
the control rack moves smoothly over the entire
stroke.
Control rack sliding resistance, N (kgf) [lbf]
Assembly Standard ... 4.9 (0.5) [1.10] or less
2. After making sure the rack sliding resistance is
lower than the standard value, install the deflector
bolts on the pump case and tighten.
Assembling delivery valves
1. In each barrel, install delivery valve, valve spring,
spring seat and valve holder in that order.
2. Apply grease to a new O-ring to prevent 0; ring
from damage, then install the O-ring on each
valve holder.
3. Using a torque wrench, tighten the valve holders
to 235 to 255 N*m (24 to 26 kgf*m) [174 to 188
lbf*ft].
Installing the bellows
Insert the protrusions on the bellows into the grooves
on the control rack and rack bushing and install the
bellows.

Advertisement

Table of Contents
loading

This manual is also suitable for:

D65a mt

Table of Contents