HANDLEBAR HOLDER
• Install the handlebar holders and related parts to the steering
stem head.
• Tighten the handlebar holder nuts to the specified torque.
Handlebar holder nut: 54 N·m (5.4 kgf-m, 39.0 lb-ft)
FRONT FORK AND STEERING STEM UPPER BRACKET
• Install the steering stem upper bracket, washer and steering
stem head nut.
• Install the front forks. (8-20)
• Tighten the steering stem head nut 1 to the specified torque.
Steering stem head nut 1: 90 N·m (9.0 kgf-m, 65.0 lb-ft)
NOTE:
Rout the brake hose, throttle cables and handlebar switch lead
wires, before installing the front forks. (10-15, -18 and -21)
• Speed sensor lead wire routing. (10-22)
• Install the handlebar. (8-22 to -23)
• Install the front wheel. (8-10 to -11)
CHASSIS 8-29