Suzuki VZ800 Service Manual page 253

Hide thumbs Also See for VZ800:
Table of Contents

Advertisement

6-18 FUEL SYSTEM AND THROTTLE BODY
• With the STV fully opened, install the STP sensor 1 and
tighten the STP sensor mounting screw to the specified
torque.
TPS and STPS resemble each other very closely in
external appearance.
Make sure to check the color of coupler before install-
ing.
STP sensor: Green color coupler
NOTE:
* Apply thin coat of the engine oil to the new O-ring.
* Align the secondary throttle shaft end A with the groove B of
STP sensor.
* Apply SUZUKI SUPER GREASE "A" to the secondary throttle
shaft end A if necessary.
 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
 09930-11950: Torx wrench
 STP sensor mounting screw: 3.5 N·m (0.35 kgf-m, 2.45 lb-ft)
NOTE:
* Make sure the STP valve open or close smoothly.
* If the STP sensor adjustment is necessary, refer to page 6-20
for STP sensor setting procedure.
• With the throttle valve fully closed, install the TP sensor 2
and tighten the TP sensor mounting screw to the specified
torque.
NOTE:
* Apply thin coat of the engine oil to the new O-ring.
* Align the throttle shaft end C with the groove D of TP sensor.
* Apply SUZUKI SUPER GREASE "A" to the throttle shaft end
C if necessary.
 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
 09930-11950: Torx wrench
 TP sensor mounting screw: 3.5 N·m (0.35 kgf-m, 2.45 lb-ft)
NOTE:
* Make sure throttle valve open or close smoothly.
* TP sensor setting procedure. (5-19)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vz800k5M50Boulevard m50Intruder vz800

Table of Contents