7-18 COOLING AND LUBRICATION SYSTEM
• Apply grease to the new O-ring.
• Install the impeller 2 and impeller shaft 3 to the water pump
body.
• Install the pin 4 and E-ring 5.
99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
• Install the new gasket 6.
• Apply grease to the O-ring.
• Set the water pump shaft end C to the oil pump shaft D.
99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
• Install the water pump.
• Tighten the screws.
• Install the water pump cover. (7-13)
• Connect the water hose.
• Install the reserve tank.
• Install the secondary gear case cover.
• Pour engine oil. (2-11)
• Bleed air from the cooling circuit. (2-18)