Suzuki VZ800 Service Manual page 219

Hide thumbs Also See for VZ800:
Table of Contents

Advertisement

5-62 FI SYSTEM
Step 2
1) Turn the ignition switch OFF.
2) Disconnect the STP sensor coupler.
3) Check the continuity between each terminal and ground.
 STP sensor continuity: ∞ Ω (Infinity)
4) If OK, then measure the STP sensor resistance at the wire
terminals (between Yellow wire A and Black wire B).
5) Loosen the inlet pipe screw. (2-7)
Lift up the inlet pipe. (5-45)
6) Close and open the secondary throttle valve by finger, and
measure the valve closing and opening resistance.
 STP sensor resistance
Secondary throttle valve is closed : Approx. 0.5 kΩ
Secondary throttle valve is opened: Approx. 3.9 kΩ
7) If OK, then measure the STP sensor resistance at the wire
terminals (between Blue wire C and Black wire B).
 STP sensor resistance: Approx. 4.69 kΩ
 09900-25008: Multi-circuit tester set
 Tester knob indication: Resistance (Ω)
Are the continuity and resistance OK?
YES
Go to Step 3.
• Reset the STP sensor position correctly.
NO
• Replace the STP sensor with a new one.
8) After repairing the trouble, clear the DTC using SDS tool.
(5-25)
(Terminal – Ground)
(Yellow A – Black B)
2
2
2
2
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vz800k5M50Boulevard m50Intruder vz800

Table of Contents