NEC Express 5800 User Manual page 434

Express5800 series
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

Status : Resource operation status
(3)
Execution buttons
Power ON
Power OFF immediate
Soft Shutdown
Hard Reset
Power Cycle
Force Dump
Remote KVMs
8
Same means as "cold reset". Cold reset includes hardware initialization.
9
After shutdown the server, the server will be powered up.
Display (value)
Stopped
BIST Running
Initializing
Initialized
Running
Stopping
: Power on server
: Shut down server forcibly
: Execute OS gracefully shutdown
8
: Execute hard reset
9
: Execute power cycle
: Execute force dump
: Move to remote console function start screen
IMPORTANT:
 About the timing for AC power off
Before turning AC power off, please confirm that the following
conditions are true and the PSU status lamp of each power unit is
blinking one minute later.
The System Power lamp of EXPRESSSCOPE® Monitor is
off.
The POWER LED of virtual LCD for all servers are off.
All resource units are powered off.
 About "Power On", "Power Off-Immediate" operation
If "Power On" operation starts, information about power
and status will be updated after 110 seconds.
If "Power Off-Immediate" operation starts, information
about power and status will be updated after 260 seconds.
Description
Stopped.
BIST Running status.
Boot-up (mounting) in progress status
Boot-up (mounting) completed status
Running status
Shutdown (mounting) in progress status
434

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents