Required Tools
Tools required for mounting to rack are a Phillips-head and a flat-blade screw driver.

Mounting Procedure

Mount the server to the rack by following the procedure below.
1. Specify the position (height) to mount the server.
The height of the server is 7U. The following image shows the positional relation between the
lower side of the server and lower side of the slide rail assembly.Hitch the holding tabs to the
same height of the rack for both front side and rear side.
NOTE:
A minus driver is used when changing the position of rack nuts.
The height of server is 7U
Front side
正面側
Hitch the holding
こ の 位 置に ホ ー
ル デ ィ ングタ ブ
tabs here
を引っ掛けます
The lower end of the server
装置の底面位置。
127
装置高さ7U
Hardware
2U
2U