Before Operating - Omron NT-series Operation Manual

Programmable terminal
Hide thumbs Also See for NT-series:
Table of Contents

Advertisement

      
2-7

Before Operating

When using Host Link/NT Link/RS-232C
Host
Check and change the
connection at the Host.
(page 31)
Refer to the manuals
supplied with the Host.
Create the Host
program.
Refer to Section 6.
Refer to the manuals
supplied with the Host.
Note
Reference
Follow the procedure given below to start the system of the NT600S.
PC
Check and change
the PC settings.

For the host link, refer
to page 31 and the
manuals for the host
link unit and peripheral
tools.

For the NT link (1:1),
refer to page 43.

For the NT link (1:N),
refer to page 47.

No special setting re-
quired for C200H di-
rect communication

For RS-232C:
Refer to page 63
Refer to the manuals
supplied with the Host.
Connect to the
NT600S.
Create the PC
program.
Start operation.
Before starting actual operation, check the screen data and the program to be run
at the Host completely for its operation.
For usable support tools, refer to Appendix H Making the Cable for Connection to
the Support Tool (page 278)
NT600S
Set the DIP switches.
(page 26)
Install to the
operation panel.
(page 27)
Connect the power
supply.
(page 28)
Connect to the PC.

(Host link: page 31)

(NT link (1:1): page 43)

(NT link (1:N): page 47)

(C200H direct commu-
nication: page 56)

(RS-232C: page 63)
Check the settings
and communications.
Transfer the
screen data.
(page 79)
Section 1-7
Support tool
Install support tools to
the computer.
Create the screens.
(refer to Section 4 and the
manuals for the support
tools)

Advertisement

Table of Contents
loading

Table of Contents