Before Operating - Omron NT620S Operation Manual

Programmable terminals
Hide thumbs Also See for NT620S:
Table of Contents

Advertisement

Before Operating

1-6
Before Operating
PC
Check and change
the PC settings.
S For the host link, refer
to page 32 and the
manuals for the host
link unit and peripheral
tools.
S For the NT link (1:1),
refer to page 43.
S For the NT link (1:N),
refer to page 48.
S For the memory link,
refer to page 54.
Connect to the
NT620S/620C.
Create the PC
program.
Start operation.
Reference
18
For details on communication between the host and NT620S/NT620C using the
memory link, see Section 6 "Using Memory Link", and for details on how to use
screens and display elements, and other information, refer to Section 5 "Using
Host Link/NT Link".
Follow the procedure given below to start the system of the NT620S/620C.
NT620S/620C
Set the DIP switches.
(page 24)
Install to the opera-
tion panel.
(page 25)
Connect the power
supply.
(page 27)
System program
installation
(Only when using
memory link)
See page 30.
Refer to the
manual for the
system installer.
Connect to the PC.
S (Host link: page 32)
S (NT link (1:1): page 43)
S (NT link (1:N): page 48)
S (Memory link: page 54)
Check the settings
and communications.
Transfer the
screen data.
(page 77)
- Use support tool NT Series Support Tool Ver. 2 (type NT-ZA3AT-EV2).
- Use the NT620S/NT620C system installer.
Section
Support tool
Install support tools
to the computer.
(refer to the manuals for
the support tools)
Create the screens.
(refer to Section 4 and the
manuals for the support
tools)
1-6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nt620c

Table of Contents