Figure 70
The Group Show Progress window displays a percent-complete indicator for drive rebuilds.
Rebuilds may take a long time to complete and cannot be aborted. An up-arrow appears above
the drive icon while it is being rebuilt.
Operations on virtual drives appear in the left panel of the window, and operations on drives
appear in the right panel. The type of operations that appear in this window are as follows:
•
Initialization of a virtual drive (see
•
Rebuild (see
•
Consistency check (see
A Modify Drive Group process cannot be aborted. To abort any other ongoing process, click the
Abort button next to the status indicator. Click Abort All to abort all ongoing processes. Click
Close to close the window.