Chapter 3 Physical Requirements of Room

1 Presentation of the 3 Rooms

1.1 Examination room

Innova LC Positioner
Omega Patient Table
Performix X–Ray Tube Assembly
Collimator
Innova Digital Detector
THE ELECTRONIC CABINETS (C1, C2, COOLIX 4000 CHILLER, DETECTOR
CONDITIONER AND FLUORO UPS WHEN INSTALLED) INCLUDE FANS THAT ARE
CREATING AIR–CIRCULATION OF PULSED–AIR. WHEN THIS PULSED AIR IS
IN AN ENVIRONMENT THAT MAY CONTAIN AIRBORNE PATHOGENS LIKE AN
EXAM ROOM/CONTROL ROOM, THERE IS A RISK OF TRANSMISSION OF THESE
AIRBORNE PATHOGENS FROM PATIENTS TO OTHER PATIENTS OR CLINICAL
PERSONNEL (NOSOCOMIAL DISEASES).
TO REDUCE THIS RISK, THE ELECTRONIC CABINETS MUST BE INSTALLED IN A
ROOM SEPARATED FROM EXAM ROOM/CONTROL ROOM, I.E., TECHNICAL ROOM.

1.2 Technical room

C2 Cabinet
C1 Cabinet
Coolix 4000 Chiller
Detector Conditioner HEAT DRY 1
Fluoro UPS (option) (1 Cabinet)
Fluoro UPS IF box (option)

1.3 Control room

VCIM
DL Flat Panel
DL Keyboard
Monitors
Chapter 3 Physical Requirements of Room
Direction 5314528-2-1EN, Revision 1
45