Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
5 IVUS Option
5.1 Wiring Diagram
The connection cables between the IVUS Control Room and Procedures Room components
run in a dedicated under floor conduit (see
A GND wire between the C1 cabinet and the IVUS CPU runs in the underfloor conduit
prepared for the Control Booth cables between Equipment Room and Control Room.
Illustration 6-14:
168
Direction 5314528-2-1EN, Revision 1
Section 5.2
).
5 IVUS Option