GE Innova 2100-IQ Preinstallation Manual page 150

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Illustration 6-2: AC Interconnect with Fluoro UPS
Contractor responsibility:
NOTE:
1. Electrical contractor is responsible for providing and connecting cables from the PDB
to the UPS (see table below) and configuring the PDB in bypass mode.
2. GEHC is responsible for powering on the system with the UPS in bypass mode.
3. GEDE is responsible for UPS commissioning.
Table 6-1: A and B cables specification
Cable
Recommended (Note (1))
A
5 X 10 mm2
B
5 X 10 mm2
Note: (1) According to local requirement.
Note: (2) According to local requirement and cable type.
150
UPS CE version
3 ph + N + PE
3 ph + N + PE
Direction 5314528-2-1EN, Revision 1
UPS UL version
Recommended (Note
Max
5 X 3 AWG
5 X 6 AWG
5 X 3 AWG
5 X 8 AWG
(2))
3 ph + N + PE
3 ph + N + PE
1 Power Distribution

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents