Machine head
FIg. 39: Setting the needle holder height (2)
(4) - Hex key
(5) - Hole
(6) - Screw
5. Remove the throat plate.
6. Remove the needles from the needle holders (8).
Information
Turning the needle holders requires that the needle bar be disconnected.
7. Use the handwheel to move the needle bars nearly up to the top dead
8. Use a hex key (4) to press down and hold the switch rod through the
9. Continue to turn the handwheel.
The depressed switch rod switches the needle bar off.
10. Relieve the switch rod.
11. Insert the measuring pin (2) into the needle holder as far as it will go.
12. Tighten the screw (7).
13. Place the measuring bridge (3) on the throat plate support.
14. Turn the needle bar to the loop stroke position and lock it in place using
It should be possible to slide the measuring bridge under the measur-
15. Unscrew the screw (6).
16. Turn the needle holder (8) to adjust its height.
Service Instructions 745-35-10 B/745-35-10 F - 00.0 - 10/2017
④
center.
hole (5).
the locking peg.
ing pin (2) with as little play as possible.
A complete 360° rotation is possible.
⑤
⑥
⑦
(7) - Screw
(8) - Needle holder
⑧
49