Table 28: Site Preparation Checklist
Item or Task
Verify that your rack meets
the minimum requirements
for the installation of the
switch.
Plan rack location,
including required space
clearances.
Secure the rack to the
floor and building
structure.
Cables
Acquire cables and
connectors:
Determine the number
of cables needed based
on your planned
configuration.
Review the maximum
distance allowed for
each cable. Choose the
length of cable based
on the distance
between the hardware
components being
connected.
(Continued)
For More
Performed By
Information
"QFX10002 Rack
Requirements" on
page 72
"QFX10002
Clearance
Requirements for
Airflow and
Hardware
Maintenance" on
page 69
See
The Hardware
Compatibility
Tool.
Date