Installing the Remote Gateway 9150 unit

LED indicator test sequence

The following diagram shows the LED indicators on the front panel:
Note: The V.35 LED indicators are present but are not functional.
During the power-up cycle, the LED indicators behave as follows:
1.
All LED indicators light for about 15 seconds.
2.
The Module LED indicators light individually in sequence (1 through 8).
3.
All LED indicators light.
4.
All LED indicators except the Status LED go out. The Status LED remains
lit.
Note: Steps 2 through 4 take about 4 to 5 seconds.
After this point, the Remote Gateway 9150 unit is functional.
Notes:
The ETHERNET TX and RX and module (ISDN BRI) LED indicators
flash only when transmit and receive activity is present on those interfaces.
The ETHERNET COLL LED indicator flashes when a data collision
occurs on the line.
112
Power
Ethernet