User Guide
Figure 108: Shipping Bracket Screw Locations (CMA Lite)
Step 31 : Plug the enclosure power cords into a PDU to power the enclosure.
Step 32 : Double check the power indicators and other LEDs to ensure that the system is booting.
3.8   Rails Replacement
Cable Ties (for configurations with greater than 10 total cables)
Option 1: M5 x 12mm T15 Flat Head Torx screws with washers
Replacement Requirements
Personnel Required
Avg. Replacement Time
Max Replacement Time
Tool
Long T15 Torx Screwdriver
# 2 Philips Screwdriver
Long T10 Torx Screwdriver
Tape measure
Level
Option 2: Toolless screwplate
Low-Profile M4 x 3.2mm Philips
screws (included with rail assembly)
3. Support

3.8 Rails Replacement

3 Total (2 for Team
Lifting Purposes and
1 to Guide and Spot)
~1 hr
N/A
Required vs. Recommended
Required
Required
Recommended
Recommended
Recommeded
Recommeded
Required
Required
106