Western Digital Ultrastar ScaleUp SE4U102 User Manual page 140

Table of Contents

Advertisement

3. Support
User Guide
3.8 Rails Replacement
Figure 135: Screw Plate Installation
Step 23 : CMA Standard: Install the two rack latch brackets at the front of the rack.
a. Orient the brackets so that the screw holes are between the two pins supporting the outer
rails as shown in the following image. There is a left and a right. Use the image below as a
guide for how to orient this bracket and mirror it for the other side. Notice the increased
distance between the top two screw holes and the lower screwholes and the flange being
oriented on the outside.
124

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultrastar data1021ex1231

Table of Contents