Step 23 : If the chassis is being installed into a rack that will be shipped fully assembled, you must install
eight (four per side) of the included M5 x 12mm T15 Flat Head Torx screws into the two brackets
at the front of the chassis in the following locations. These screws should be tightened to
3.38-3.61 Nm / 30-32 in-lbf using a Long T15 Torx Screwdriver. If this chassis will not be installed
into a rack for shipping purposes, skip this step and move on to the next one.
Figure 84: Shipping Bracket Screw Locations
Step 24 : Plug the enclosure power cords into a PDU to power the enclosure.
Step 25 : Double check the power indicators and other LEDs to ensure that the system is booting.
3.8   Rails Replacement
Cable Ties (for configurations with greater than 10 total cables)
Reuse: M5 x 12mm T15 Flat Head Torx screws
Replacement Requirements
Personnal Required
Avg. Replacement Time
Max Replacement Time
Tool
Long T15 Torx Screwdriver
# 2 Philips Screwdriver
Long T10 Torx Screwdriver
Tape Measure
Level
Reuse:Included Washers
3. Support

3.8 Rails Replacement

3 Total (2 for Team
Lifting Purposes and
1 to Guide and Spot)
~1 hr
N/A
Required vs. Recommended
Required
Required
Recommended
Recommended
Recommeded
Recommeded
Required
Required
90