Last Maintenance Date - Omron SmartSlice GRT1-OD4G-1 Operation Manual

Table of Contents

Advertisement

Functions Shared by all Units
2-3-8

Last Maintenance Date

Function Overview
Setting with a
Programming Device
1,2,3...
28
This function can be used to write the date on which maintenance was last
performed to the Unit. This means that the timing for future maintenance can
be judged more easily. The date can be written using the network Program-
ming Device.
This example shows how to use the DeviceNet Configurator (version 2.43 or
higher) to check the last maintenance date.
1. Open the Network Configuration Window and double-click the desired
Slice I/O Terminal's icon or right-click the icon and select Parameters -
Edit to display the Edit Device Parameters Window.
2. Select the desired Slice I/O Unit from the list on the I/O Module Tab Page
and click the Edit Button.
3. Click the General Tab and select the desired date from the pull-down menu
in the Last Maintenance Date Field. (Click the Today Button to enter the
current date.)
4. Click the Download Button, and then click the Reset Button to reset the
Unit.
5. Click the OK Button.
Section 2-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents