Omron ZJ-SD Series User Manual page 30

Smart electrostatic sensor
Table of Contents

Advertisement

Section 2
Installing Sensor Heads
Preamplifier
■ Installation
1.
Use M3 screws to fix the enclosed Preamplifier
mounting bracket.
Use the ZX-XBT2 Preamplifier DIN Track Mounting Bracket
(order separately) when mounting the Preamplifier onto a
DIN Track.
2.
Fit one end of the Preamplifier into the bracket.
3.
Fit the other end of the Preamplifier into the
bracket.
To remove the Preamplifier from the mounting
bracket, lift upwards while holding the center of the
Preamplifier.
■ Using the Product in Conformance with CE
To use this product in conformance with CE, loop the cable twice around the enclosed
ferrite core as shown below.
ZJ-SD
16
User's Manual
Sensor
Two loops
Ferrite core
Fit one end into the bracket.
Fit the other end
into the bracket.
[Removal]
Lift while holding the center.
10 mm max.
Amplifier

Advertisement

Table of Contents
loading

Table of Contents