〈14〉Documentation of set values
The following facilities are available to document the executed settings outside the device:
● External memory card was inserted during the RAM to ROM (p0977=1). The parameters
were therefore also transferred to the external CompactFlash Card.
● Write the parameters to a CompactFlash Card (p0804).
● Document the parameters in a STARTER project (load to PG). See also Chapter
"Memory card functions (Page 359)" and "Commissioning with the STARTER
commissioning tool (Page 287)".
8.4
Commissioning using the AOP30 operator panel
8.4.1

First commissioning

Note
To operate the AOP30, p2030=3 must be set.
8.4.1.1
First power-up
Start screen
When the system is switched on for the first time, the Control Unit (CUD) is initialized
automatically. The following screen is displayed:
Figure 8-2
While the system is powering up, the parameter descriptions are loaded to the operator
panel (remark: The memory card does not have to be inserted).
SINAMICS DCM DC Converter
Operating Instructions, 12/2018, A5E34763375A
Splash screen
8.4 Commissioning using the AOP30 operator panel
Commissioning
281

Advertisement

Table of Contents
loading

Table of Contents