7 Connection of Control Unit

7.6.3 Connecting with Drive Unit MDS-EJ/EJH Series

CAUTION
1. Connect the NC and the drive units by the optical communication cables. The distance between the NC and the
final drive unit must be within 30m and the bending radius within 80mm.
2. A spindle drive unit that controls the high-speed synchronous tapping (OMR-DD control) has to be connected
on the farther side from the NC than the servo drive unit that is subject to the synchronous tapping control.
POINT
Axis Nos. are determined by the rotary switch for setting the axis No. (Refer to section "Setting the Rotary
Switch".)
The axis No. has no relation to the order for connecting to the NC.
CN1A: CN1B connector on NC or previous stage's drive unit
CN1B: CN1A connector on next stage's drive unit
Connected
to the NC
Refer to the
instruction manual
of each NC for
details.
MDS-EJ-V1
1st axis
Optical
communication
cable
The optical communication cables from the NC to the
final drive unit must be within 30m.
MDS-EJ-V1
MDS-EJ-V1
2nd axis
3rd axis
195
MDS-EJ-SP
4th axis
IB-1501269-F