Framing And Finishing Inset Installations Cv40E - Regency CV40E-NG Owners & Installation Manual

City series zero clearance direct vent gas fireplace
Table of Contents

Advertisement

Framing and Finishing Inset Installations CV40E

1. Frame in the enclosure for the unit with framing material
Note: When constructing the framed opening ensure there is access to install
the gas lines,electrical. Also the wiring harness must be wall mounted using
the receptacle provided with the appliance. The wiring harness will be located
on the right hand side of the appliance if facing the unit from the front. This
must be done prior to any inishing.
2. For exterior walls, insulate the enclosure to the same degree as the rest of
the house, apply vapour barrier and drywall, as per local installation codes.
(Do not insulate the ireplace itself.)
WARNING: Failure to insulate and add vapor barriers to the inside of the
exterior wall will result in operational and performance problems including, but
not limited to: excessive condensation on glass doors, poor lame package,
carbon, blue lames etc. These are not product related issues.
3. The unit does not have to be completely enclosed in a chase. You must
maintain clearances from the vent to combustible materials: See "Clear-
ances" section. Combustible materials can be laid against the side and back
standoffs and the stove base.
4. Combustible material (drywall,wood,wood panels, etc.) may be brought up
to the appliance (top,bottom and sides)
5. Ensure that the material being used does not encroach anywhere in the
area of the glass. This would cause dangerous operating conditions.
6. This appliance comes with a 1/2" lip at top and bottom to hide the ends of
the drywall. If using 1/2" drywall on the single sided unit, it is highly recom-
mend that the optional Finishing trim be used. This will hide the end of the
drywall at all 4 corners and the seam in front. The 1/2" side and bottom lip
supplied with the appliance can alternatively be removed (see Diagram 1)
and replaced with J Style Trim or Metal Corner Bead purchased at your local
hardware store to cover cut/exposed edges of the combustible facing mate-
rial or any other inishing materials being used. 4 screws secure the bottom
lip — see Diagram 1. These will be hidden so the outer panels will need to
be removed to access the screws. See outer panel removal in this manual.
7. This appliance can also be recessed (using combustible materials) with a
hearth in front of the appliance. This can also extend to the top. See below
for details.
**Combustible material may extend a minimum of 1/2" and to a maximum of
2-1/2" from the Front top face of the appliance as shown. If 2 1/2" is insuf-
icient non combustible material may be used to extend the inished material
further out or alternatively be staggered if using combustible materials. See
mantle clearance chart for details. The base and sides have no limit when it
comes to how far the combustible material may extend out from the appliance.
40-3/16"
**Combustible material
**Combustible material
Drywall guide
Diagram 1 - Loosen 4 screws and lift of lower drywall guide
Note: an offset screwdriver is provided with the appliance for ease of removal/
installation.
installation
Do not place any materials
where glass is located
City Series |
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cv40e-lpCb40e-ngCb40e-lp

Table of Contents