Checklist D Procedures; Check The Boom Wear Pads - Genie S-80 Service Manual

Hide thumbs Also See for S-80:
Table of Contents

Advertisement

February 2017
D-1

Check the Boom Wear Pads

Genie specifications require that this procedure be
performed every 1000 hours or annually,
whichever comes first.
Maintaining the boom wear pads in good condition
is essential to safe machine operation. Wear pads
are placed on boom tube surfaces to provide a low
friction, replaceable wear pad between moving
parts. Improperly shimmed wear pads or continued
use of extremely worn wear pads may result in
component damage and unsafe operating
conditions.
Note: If the wear pads are still within specification,
refer to Repair Procedure, How to Shim the Boom.
1
Start the engine from the ground controls.
2
Raise the end of the boom to a comfortable
working height (chest high), then extend the
boom 1 foot / 30 cm.
1 Boom 1
2 Boom 2
3 Boom 3
Part No. 1259369GT

Checklist D Procedures

3
Measure each wear pad. Replace the wear
pad if it is less than specification. If the wear
pad is still within specification, shim as
necessary to obtain zero clearance and zero
drag.
4
Extend and retract the boom through the
entire range of motion to check for tight spots
that may cause binding or scraping of the
boom.
Note: Always maintain squareness between the
outer and inner boom tubes.
Boom wear pad specifications
Boom number one
Bottom wear pads
(extension end of boom)
Top and side wear pads
(extension end of boom)
Boom number two
Top, bottom and side wear pads
(extension end of boom)
Bottom wear pads
(pivot end of boom)
Top and side wear pads
(pivot end of boom)
Boom number three
Top, bottom and side wear pads
(pivot end of boom)
S-80 • S-85 • S-80X
Service Manual
Minimum
1/2 inch
12.7 mm
5/8 inch
15.9 mm
1/2 inch
12.7 mm
1/2 inch
12.7 mm
5/8 inch
15.9 mm
1/2 inch
12.7 mm
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-85S-80x

Table of Contents