Check And Adjust The Engine Rpm - Genie S-80 Service Manual

Hide thumbs Also See for S-80:
Table of Contents

Advertisement

Service Manual
Checklist C Procedures
C-5
Check and Adjust the Engine
RPM
Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first.
Maintaining the engine rpm at the proper setting for
both low and high idle is essential to good engine
performance and service life. The machine will not
operate properly if the rpm is incorrect and
continued use may cause component damage.
Not applicable to these models:
Continental TME27 Model
Deutz TD 2.9 L4 Model
Perkins 404F-22T Model
Note: The engine rpm is controlled by the ECM and
can only be adjusted by re-programming the ECM.
If rpm adjustment or service is required, please
contact Genie Product Support.
Deutz TD2011L04i Model:
1
Connect a tachometer to the engine. Start the
engine from the ground controls and check the
rpm. Refer to Specifications, Engine
Specifications.
50
1 low idle adjustment screw
2 yoke
3 high idle adjustment nut
Skip to step 4 if the low idle rpm is correct.
2
Loosen the locknut on the low idle adjustment
screw.
3
Adjust the low idle adjustment screw until low
idle meets specification. Tighten the locknut.
4
Push and hold the function enable/high speed
button. Note the engine rpm on the display.
Refer to Specifications, Engine Specifications.
If the high idle is correct, disregard adjustment
step 5.
5
Loosen the yoke lock nut. Turn the high idle
adjustment nut and solenoid boot
counterclockwise to increase the rpm or
clockwise to decrease the rpm. Tighten the
yoke lock nut and recheck the rpm.
Note: Be sure the solenoid fully retracts when
activating high idle.
S-80 • S-85 • S-80X
February 2017
Deutz models
Part No. 1259369GT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-85S-80x

Table of Contents